Bloomberg: Texas Oil Drillers Are Driving Increasing Demand For Solar Power In Texas
April 04,2019
Bloomberg reports on increasing solar installations in Texas, particularly to serve oil and gas fields
Bloomberg reports that solar farm construction costs $32 per megawatt-hour, versus $38 for a high-efficiency natural gas generator, citing BloombergNEF data