The Brooklyn Union Gas Company d/b/a National Grid NY (KEDNY) and KeySpan Gas East Corporation d/b/a National Grid (KEDLI), and separately Niagara Mohawk Power Corporation d/b/a National Grid, have filed revised Gas Transportation Operating Procedure (GTOP) Manuals with the New York PSC
NiMo said that its GTOP revisions include:
• Page 25 to 26 – Verbiage added regarding accepting assigned capacity and re-assigning capacity.
• Page 26 to 27 – Allocation table replaced.
• Page 28 – Verbiage added regarding accepting storage capacity assignment and terms of storage transportation assignment.